Two quotes: solar now, backup only if you need it
Price one New London home two ways. As solar only, the quote works out to $2.90 per watt. With a battery and backup subpanel folded in, the same roof reads $5.29 per watt. The panels didn't change. The second number simply divides battery money by solar watts (Illustrative calculation, worked through below).
That is why we split the job in two.
- Quote A, solar only. Panels, roof layout, expected yearly production and one price you can divide by the system's DC watts. DC watts are the panels' rated outputs added together: sixteen 400-watt panels make 6.4 kW DC.
- Quote B, backup for chosen circuits (optional, priced separately). A battery sized for a short list of circuits you pick, such as the refrigerator, sump pump, boiler controls and Wi-Fi, plus the wiring and settings that list needs.
If you are comparing solar installers in New London, CT, ask every one of them for the same split. A single bundled number hides two separate decisions: whether the solar is fairly priced, and whether the backup fits what must keep running in your house.
Decide first whether you need Quote B at all. A grid-tied system, one connected to Eversource's lines, switches off in an outage. To keep running, it needs storage and an inverter configured for that job, as the Department of Energy's solar and resilience basics explain. If a sump pump guards a finished basement, or someone at home depends on a powered medical device, Quote B is worth pricing. If an outage is an annoyance rather than a risk, Quote A may be all you need.
In New London the split also matters for money. The City is on the state's 2025 distressed-municipalities list, so the state's solar tariff adds a bonus on each kWh your panels produce. The state battery program pays separately: an upfront amount per kWh of battery, then yearly pay for what the battery delivers during grid events. Solar and storage earn on different terms, so price them on different terms.
We work across New London and the shoreline towns.
The assessment: what we'd check and what you bring
Before any price, we run an on-site assessment of about two hours (Illustrative duration, set by your property):
- Your bill. Twelve months of kWh use and the utility name on the bill. Together they decide the tariff and the forms.
- Roof and shade. Roof age and condition, usable roof faces, and shade on each face.
- Your electrical panel. Main panel rating, spare breaker spaces, service size, meter location, and whether a backup subpanel is needed.
- The circuits you can't lose. A breaker-by-breaker interview that flags motor loads, such as a sump or well pump, which draw a surge as they start.
- Where equipment could go. Basement, garage or outside wall, checked for flood exposure, clearances and the cable route to your panel.
Bring to the visit
- Twelve months of bills, or your Eversource usage download
- Roof age; if you don't know it, the City's permit records may show the last re-roof
- Planned changes: a heat pump, an electric car, an addition
- Whether the building is a designated historic structure and whether it sits in the 100-year flood plain (the City's permit application asks both)
- A first draft of your must-run list
Those twelve months of kWh do one more job. Connecticut's property-tax exemption for home solar applies only when estimated yearly production does not exceed the home's estimated yearly load. Ask for Quote A's size to be justified against your own numbers, not a round figure.
What Quote A and Quote B would put in writing
If any field below is blank on a quote you receive, ask for it before you compare prices.
kWh (kilowatt-hours) measures how much energy a battery holds; kW (kilowatts) measures how fast it delivers that energy. Usable kWh is what the battery can actually supply to your circuits, so ask for that figure rather than a model's headline size; some energy is also lost going in and out, because no storage is 100% efficient. Continuous kW is the load the battery carries for hours. Surge kW is the brief peak while a pump motor starts. Runtime assumptions turn those numbers into hours: starting charge, reserve, assumed load, and solar recharge by day. A runtime without them can't be checked.
Quote B is built around the critical-loads list. We start from four to eight circuits and make the quote name the ones that stay on and the ones that go dark. Quote B would also say whether those breakers move to a backup subpanel, a small breaker box fed by the battery, or use other transfer equipment. You'd get a circuit map with it: your panel schedule with the backed-up breakers marked.
Check who does the wiring. Under the Department of Consumer Protection's solar trade licensing rules, a PV-1 or PV-2 solar license does not cover connecting to your existing panel, wiring or meter; that work needs an E-1 or E-2 electrician. Both quotes end at your panel, and Quote B rewires part of it.
Then check where the battery would sit. If the spot is a basement or low garage in the 100-year flood plain, ask the Building Department about equipment elevation before you accept the location. Ask the installer which building code section allows the spot. Residential storage rules sit in code section R328, so check Connecticut's adopted limits with the Building Department. Flood rules shape placement next door too, as Waterford's flood-zone permit step shows.
Illustrative calculation: one New London home, priced two ways
None of these are New London Solar prices. They show how the two quotes read on paper.
Illustrative calculation. A household on Eversource uses 8,340 kWh a year, the Connecticut statewide average consumption in EcoGen's data (695 kWh a month).
- Size. EcoGen's statewide production factor is 1,294 kWh per kW per year (State benchmark). 8,340 ÷ 1,294 ≈ 6.4 kW.
- Quote A, solar only. 16 panels × 400 W = 6,400 W DC at $18,560 (Illustrative). $18,560 ÷ 6,400 W = $2.90 per watt.
- Same job with backup folded in. Add a 13.5 kWh battery at $13,500 (State benchmark, EcoGen's modeled battery cost) and a $1,800 critical-loads subpanel (Illustrative). $33,860 ÷ 6,400 W = $5.29 per watt.
- City permit fee. $18.26 per $1,000 of estimated construction value, rounded up. $18,560 rounds to $19,000: 19 × $18.26 = $346.94. With battery and subpanel on the same permit value ($34,000): $620.84. Whether the City permits storage separately is unknown; ask.
- First-year production. 6.4 × 1,294 ≈ 8,282 kWh before shade, under the 8,340 kWh load, so the property-tax condition holds.
- Distressed-municipality adder (2026 values). Netting: 8,282 × $0.0175 ≈ $145 a year. Buy-All: 8,282 × $0.0275 ≈ $228 a year.
- Netting production charge (2026). 8,282 × $0.0402 ≈ $333 a year.
- Battery program enrollment. 13.5 kWh × $30 = $405 standard, or $1,755 at the Grid Edge rate. Yearly performance pay depends on what the battery delivers during events.
Two line items here come from New London's own position: the fee formula is the City's, and the adder depends on its place on the distressed list. A house in another town can get different line items from the same roof. Real production comes from your roof's shade report, so treat 8,282 kWh as an unshaded statewide estimate, not your roof's number.
Is Quote A fairly priced? Run the per-watt check
Check Quote A in three steps.
- Strip the extras. Move any battery, backup subpanel, roof repair, main panel upgrade or generator inlet onto separate lines. We never fold those into the solar price.
- Divide. Solar-only total ÷ the system's DC watts, which is how most quotes state size. Ask the installer to confirm the figure is DC, not AC.
- Compare. Set the result against the Connecticut benchmark.
EcoGen's Connecticut solar cost page puts the state at $2.80 per watt (State benchmark, September 2026 Edition, prices as of Sept 25, 2026), with written quotes typically between $2.46 and $3.14 per watt. It is a modeled installed price per watt before incentives for a representative home, not a quote for yours, and EcoGen doesn't say whether it is per DC or AC watt.
In the example, $2.90 per watt sits about 3.6% above the benchmark and inside the band, which for 6.4 kW runs $15,744 to $20,096 (Illustrative calculation).
The bundled $5.29 per watt looks almost twice as expensive. It isn't overpriced solar; it's a scoping problem. Compare that figure with the benchmark and you would reject a fair quote.
The reverse also holds. A fair Quote A says nothing about whether Quote B is the right backup. Judge Quote B by its circuit list, kWh, kW and runtime assumptions, not per watt.
Still above the band after stripping the extras? Ask for the gap explained line by line, in writing.
What moves which quote
Two tax lines to check on Quote A
Solar systems, installation included, are exempt from Connecticut sales tax; the installer uses Form CERT-140, so no sales tax should appear on the solar lines. And under CGS 12-81, the property-tax exemption needs the state form (M-44) filed with the assessor by Nov 1, with estimated production no higher than estimated load. Miss the date and you lose that year's exemption.
New London permits: Building, Zoning, historic district, flood plain
Solar here can touch up to three City offices. Find out which apply to your address before you sign; each adds a step and an owner.
The building permit
The City of New London Building Department at 111 Union Street issues the permit and enforces the state building code and the City's Flood Plain Management Ordinance. Applications go in person, by mail, in the dropbox there, or through the department's online link.
The fee follows the City's posted building permit fee schedule: $18.26 per $1,000 of estimated construction value, rounded up ($18.00 City plus $0.26 State Education Fund). The file dates from 2022 and was still linked on Nov 18, 2026. It shows no solar fee exemption.
The application asks the estimated cost, whether the building is a Designated Historic Structure, and whether it sits in the 100-year flood plain. It marks "Alteration" work as needing Planning & Zoning approval. Whether rooftop solar counts as an Alteration isn't stated, so ask the Building Department.
For a roof-mounted system of 12 kW or less on a single-family home, CGS 16-245nn gives the town 30 days to say whether the application is approved. That's a legal clock on the City, not an installation schedule, and it doesn't override historic district review.
In a local historic district
Exterior changes in a local historic district need a Certificate of Appropriateness, written approval from the New London Historic District Commission. Applications are filed online. The commission meets on Zoom on the third Wednesday at 6 pm, with materials due the Friday eight working days before: Jan 8 for the Jan 20, 2027 meeting. Submit three packets (application, supporting documents, and streetscape photos of both sides of the street), and send a representative to the meeting.
Under CGS 7-147f, the commission may not deny a solar application unless the system can't be installed without substantially impairing the district's historic character and appearance. It can require design changes and location limits that don't significantly impair the system's effectiveness. Expect layout negotiation, not a flat no.
A National Register listing is not the same as a local historic district. Check your address with the City's land-use staff before assuming either way.
Eversource handoff: Netting or Buy-All, plus the New London adder
Check the name on your bill. New London has no town-owned electric utility; Eversource delivers power here. If a bill says Groton Utilities, the tariff and battery-program terms below don't apply; see how Groton Utilities customers are paid for solar.
Eversource pays for rooftop solar through the Residential Renewable Energy Solutions program (RRES), the state tariff that replaced net metering. The PURA RRES program page lists the latest decision, Program Year 5 (Docket 25-08-02). You pick one option when you apply, and it holds for 20 years.
Those are 2026 application rates; 2027 rates had not been set as of Nov 18, 2026. The program runs through Dec 31, 2028, unless PURA launches successor programs sooner, and systems cap at 25 kW AC, storage not counted. Every application needs a signed Customer Disclosure Form. Ask to see yours, completed, before you sign the contract.
The adder exists because New London is on the Department of Economic and Community Development's distressed municipalities list (2025). It's paid on production-meter kWh and applied automatically when you, the customer of record, are the payment beneficiary. Only one adder applies per system; if you might qualify for the higher income-eligible adder, ask which applies, and confirm the value on your application. For how the choice plays out with a backup battery on the shoreline, see Netting vs Buy-All for backup in East Lyme.
The battery program, and why Quote B states a reserve
Energy Storage Solutions (ESS) pays Eversource customers who enroll a battery through an eligible contractor. For applications from April 1, 2026: $30 per kWh upfront ($130 at Grid Edge locations), then $300 per kW a year for 10 years ($450 underserved, $550 low-income). Batteries are called for about 50 summer and 5 winter events, and pay follows the average kW delivered during them, so opting out lowers it. Grid Edge and underserved status depend on the address.
Each event discharges part of the battery you bought for outages. So Quote B should state the reserve setting, the share held back for your own outage, and show runtime from that reserve, not from a full battery. A higher reserve protects your circuits; a lower one leaves more for the events ESS pays for. That trade-off is yours to make, in writing.
From signed scope to Approval to Operate
Ask for a responsibility sheet with an owner on every step (the owners below are an example). It carries no durations, because the City and Eversource set those.
- Sign the scope, Quote A and optionally Quote B. Owner: you.
- Historic District Commission certificate, if the house is in a local district. Owner: installer, with a representative at the meeting.
- Planning & Zoning sign-off, if the job counts as an Alteration. Owner: installer.
- Building permit intake, which starts the City's 30-day decision clock for qualifying single-family roof systems. Owner: installer.
- Eversource interconnection and RRES applications. Owner: installer files; you sign the tariff application and Customer Disclosure Form.
- Utility review and approval. Owner: Eversource.
- Installation. Owner: installer, with an E-1 or E-2 electrician for the panel tie-in.
- City inspection and release. Owner: installer and Building Department.
- Meter, plus a witness test if Eversource requires one. Owner: installer pays; Eversource installs.
- Approval to Operate, Eversource's written permission to switch on. Owner: Eversource.
- Switch-on. Owner: installer.
- ESS enrollment, if Quote B applies. Owner: the eligible contractor; ask at which step they file it.
- State exemption form (M-44) to the assessor by Nov 1. Owner: you.
After switch-on: monitoring and warranty questions
At handover, we give you monitoring access and the labeled circuit map. Keep both with the Approval to Operate letter.
Compare early production with Quote A's yearly estimate, allowing for season; a clear shortfall is a question for the installer.
Before signing, the Federal Trade Commission's solar guidance suggests getting in writing what the equipment and workmanship warranties cover and for how long, who pays for repairs, whether output is guaranteed and what happens if it falls short, and what happens if the roof needs repair after installation.
In a historic district, keep the Certificate of Appropriateness. Changing the array later may need another review.
Questions to ask before you sign
Ask every bidder. The quote checklist on this site holds the same points in a form you can fill in.
Price
- What is the solar-only total, and the price per DC watt?
- Are battery, subpanel, roof work, panel upgrade and generator inlet on separate lines?
- Is the City permit fee included, and on what construction value?
Sizing and money
- Which 12 months of kWh is the size based on, and does estimated production stay at or below that load?
- Netting or Buy-All, and which year's rates?
- Is the distressed-municipality adder applied, at which value?
- Who owns the system, and who receives incentives and payments?
Backup (Quote B)
- Which circuits stay on, and which go dark?
- Usable kWh, continuous kW, surge kW?
- Runtime from which starting charge, reserve and recharge assumptions?
- What reserve setting applies during ESS events?
- Where will the battery go, and which code section allows that spot?
People and paperwork
- Whose E-1 or E-2 license covers the panel tie-in?
- Who files the historic, zoning, building and Eversource applications?
- Can I see the completed Customer Disclosure Form before I sign?
From Feb 15, 2027, Connecticut limits in-person solar and storage sales visits to 9 am to 7 pm and makes sellers report their sales partners to the state. A knock outside those hours is a reason to slow down.
Short answers for New London homeowners
Does solar keep my power on in an outage? Not by itself. Backup needs a battery and a configured inverter, which is what Quote B prices.
Is there still a 30% federal tax credit? No. The IRS Residential Clean Energy Credit isn't available for property placed in service after Dec 31, 2025, batteries included.
How long until solar pays for itself? Not without your inputs. Ask for the payback math with its assumptions shown: your 12 months of kWh, the tariff you'd elect and that year's rate, the adder, and under Netting the $0.0402 production charge. A payback figure that values every kWh at the retail rate and skips that charge overstates a Netting system's return.
Can I install more solar than I use? The tariff caps systems at 25 kW AC. But if estimated production exceeds estimated load, the system doesn't qualify for Connecticut's property-tax exemption.
Do I need a battery to get paid? No. Buy-All pays for every kWh produced, Netting credits what you export, and the adder is paid on production under either. A battery earns separately through ESS, for its enrollment and for what it delivers during events.